INDUSTRIAL

INDUSTRIAL

Industrial-scale energy storage that cuts costs, improves power quality, and keeps production running without interruption.

WhatsApp

Industrial MPS — NovaMax

Cut your contract demand without cutting production.

NovaMax is a high-capacity, industrial-grade Machine Protection System engineered for manufacturing plants, processing facilities, and heavy industrial operations. Cut demand charges by up to 40%, sharply reduce diesel dependency, stabilize power quality for sensitive equipment, and ensure zero-downtime production. Built to handle the most demanding industrial loads with proven reliability and rapid ROI.

Peak shaving

-40%

vs. unmanaged factory load

Switchover

< 20 ms

PLC- and VFD-safe

Cycle life

6,000+

LFP chemistry

Footprint

-70%

vs. lead-acid bank

Live Power Flow

GRIDPEAK ₹/kWhNOVAMAX MPS● CHARGING87%STORE → DISCHARGEYOUR FACTORYSTABLE 24/7 LOAD↓ -40% peakdemand charge⚡ STABLE+/- 0.5% VrmsCLEAN POWERACTIVE FLOWLIVE LOAD MAP

Market Outlook — India

Industrial MPS isn't optional anymore

Demand charges in industrial tariffs across Maharashtra, Gujarat and Tamil Nadu now exceed ₹450/kVA. Diesel hit ₹95/L. The economic case for behind-the-meter storage flipped in 2024 — and 2026 is the catch-up year.

India MPS by 2030

₹48,000 Cr

Industrial + C&I lead the segment, ahead of utility-scale.

CAGR 2024–30

46%

Driven by demand charges, peak tariffs and renewable mandates.

Why now

Time-of-Day tariffs are reshaping factory economics.

CERC mandates ToD pricing across all India C&I consumers ≥ 10 kW from Apr 2025. Off-peak charging and peak discharge can shift 30–50% of monthly energy spend — but only with deployed storage.

  • Captive solar penetration grew 2.4× in MSME industrial belts (2022–25). MPS unlocks the unused evening/night fraction.
  • BIS-IS 16270 / IEC 62619 certifications now mandatory — Yoshinova is compliant out of the box.
  • PLI and MNRE incentives apply to integrated MPS+RE projects above 500 kWh capacity.

Live load profile

Peak shaving in real time

The grid pulls a sharp daytime spike. NovaMax discharges through the peak window, leaving only a flat, low-cost load on your meter.

0255075100kW00:0006:0012:0018:0024:00HOUR OF DAYWithout MPSWith NovaMaxLIVE

Peak shaved

-40%

measured peak vs. unmanaged contract demand

Today's saving

₹14,280

across all three phases, across all shifts

Carbon offset

184 kg

CO₂e displaced from grid coal

Sectors we power

Industries running on NovaMax

Every floor is different. We've shipped industrial-grade MPS across heavy and light manufacturing — here's where the ROI lands fastest.

Sector 01

Steel & Metal Processing

Furnaces, rolling mills and electric arc loads need stable voltage. NovaMax flattens sharp current draws and protects sensitive control systems.

-38%

demand charge

Sector 02

Textiles & Garments

Continuous shifts and motor-heavy floors. Avoid line stops during DG switchover and run looms straight through grid dips.

0 sec

switchover gap

Sector 03

Food & Beverage

Cold storage, packaging and CIP cycles can't tolerate outages. MPS rides through brownouts and protects spoilage risk.

24/7

cold chain

Sector 04

Chemicals & Pharma

GMP-grade facilities demand clean, stable power. Eliminate harmonics and voltage spikes that compromise batch quality.

±0.5%

voltage stability

Sector 05

Plastics & Moulding

Injection cycles spike at start. Shave peak draw without oversizing your sanctioned load — keep contract demand low.

-42%

peak kVA

Sector 06

Auto Components

Tier-1 and Tier-2 suppliers facing OEM uptime SLAs. Pair MPS with rooftop solar to lower your green-supply ratio.

6 yr

avg payback

Process

From audit to live ROI in under 30 days

01

Floor-level Energy Audit

Our Chief Energy Advisor walks the plant — meter by meter. We pull 30-day load data, isolate motor inefficiencies, harmonics and contracted-demand exposure.

02

Right-Sized MPS Design

NovaMax modules are sized to your real load curve, not nameplate ratings. We engineer for the kVA you actually pull, not what you fear pulling.

03

Commissioning in 5–7 Days

Pre-fabricated containers ship ready-to-connect. Switchgear cut-overs scheduled around your shifts — most lines never see the change.

04

Live ROI Dashboard

BMS + IoT push real-time SOC, kWh discharged, ₹ saved and CO₂e offset to your phone. Verify your payback as it accrues, not at year-end.

Industrial floor

Built for India's industrial backbone

Engineered in Bahadurgarh. Proven on factory floors from Pune to Pithampur.

GET STARTED

Power Your Industrial Operations

Schedule a facility energy assessment and discover how MPS can reduce costs and improve reliability.

View All Services